Installation of SNB posts (concreting) + instructions for self-installation

Product Code: 11142
1
Available Solutions

  • Installation + instructions

  • SNB800-83 80sm

  • SNB750-83 75sm

  • SP09 85sm

  • SNB500-83 50sm
In stock
810.00 грн

Installation of SNB posts (concreting) + instructions for self-installation



We have been doing professional installation of our parking and road equipment, including concreting of metal posts SNB Lemus in Kyiv since 2005.


In order to order installation in Kyiv and the region,

  • choose the type and number of road posts you need
  • then select the required installation option on this page according to the number of
  • make an order online.

Or call!

When ordering installation, delivery in Kyiv is free.


If you are not in the Kiev region or want to do the installation yourself, the instructions below will describe the process of installing road metal posts using the concreting method.


Installing Lemus SNB stainless road bollards is a process that you can do yourself.



Installation of SNB road posts - concreting - installation instructions



Step 1 Preparing the installation site



Choose a place to install the post and clear it of debris, stones and other obstructions. Make sure that the installation site is located in accordance with the requirements of the project design and road infrastructure.


Step 2: Well Preparation



At the installation sites, make a hole with a diameter of 150 mm or more, depending on the required strength declared in the project. Hole depth from 250mm.


Step 3: Preparing the Concrete Mix



Prepare the concrete mix. One of the most popular formulas for preparing the material is 1:3:6 (cement, sand, crushed stone) and 50% water based on the total weight of the dry components.


Step 4: Post Installation



Pour some concrete mixture into the hole. Set the post in the center of the hole. Make sure it is upright, secure, and the flange is level with the pavement.

Then pour concrete into the remaining space between the vertical post and the pavement.

When fixing the column, its position is checked by a vertical level.


Step 5: Finishing the installation


Clean the flange and post from traces of concrete. Allow the concrete to dry for at least 24 hours, preferably several days, before allowing people or traffic to pass.



When installing on a tile, the tile is previously removed at the installation site. In step 4, the concrete mixture is poured to the bottom level of the adjacent tile, and after the post is installed, the tile is laid in its original place. The places of its absence are concreted to the level of the road surface.

Write a review
Note: HTML is not translated!
Related Products
icon_viber Viber icon_whatsapp WhatsApp icon_email Email